Two fitters can look at the same kitchen and price it very differently. One quotes £1,700. The other quotes £4,600. Neither of them is trying it on. They have priced different work, and the quote almost never says so. Kitchen fitting cost is one of those numbers that only makes sense once you break it into the jobs it pays for, and once you know whether the price covers one pair of hands or five.
Labour-only kitchen fitting for a standard UK kitchen runs about £1,700 to £3,000. Most fitters charge £250 to £350 a day, rising to £350 to £500 in London and the South East, or £70 to £120 per unit on simple swaps. Add £180 to £400 a day for each other trade you need. Labour is usually 30% to 40% of a full kitchen budget.
What Kitchen Fitting Cost Covers in 2026
Labour-only fitting for a standard kitchen sits between £1,700 and £3,000. That is the number to anchor on if you have already bought your units and you just need them installed.
The trouble is that "fitting" means different things to different firms. At the narrow end it means one fitter hanging your units, cutting your worktop and putting the doors on straight. At the wide end it means a small team who strip the old kitchen out. They move a waste pipe, run a new circuit, plaster, tile, then take the rubbish away.
For a small-to-large kitchen, labour-only work commonly lands at £2,200 to £4,600, once those extra trades are in. That is not a different market from £1,700. It is the same market, quoted with more of the job included.
So the first question to ask any fitter is not "how much". It is "what is in this, and what am I arranging myself". A quote that cannot answer that in a sentence is a quote you cannot compare.
Kitchen Fitter Day Rates Across the UK
Most UK kitchen fitters work to a day rate. In 2026 that rate is commonly £250 to £350 a day. Some price guides put the national average slightly lower, at £200 to £300, which tells you the honest spread is wider than any single figure suggests.
Where you live moves it more than anything else. London and the South East run higher, and experienced fitters there charge £350 to £500 a day. Across a five-day fit, that gap alone is worth £500 to £1,000. On a longer job it grows.
Broken down by the hour, fitting averages roughly £37 an hour. That figure is more useful than it looks. It gives you a way to sanity-check a half-day call-out or a small snagging visit without arguing about a full day.
A higher day rate is not automatically a worse deal. A fitter at £400 a day who finishes in four days costs less than one at £280 who takes seven. Ask how many days the job will take before you compare rates, because the daily number on its own tells you very little.
Kitchen Fitting Cost per Unit and per Kitchen
The other common model is per unit. Fitters using it charge about £70 to £120 per unit, and some price guides put simple installs at £100 to £150 per unit.
Per-unit pricing suits a straight swap, where the layout stays put and nothing moves. You can count your own units and get within a few hundred pounds of the answer before anyone visits. A ten-unit kitchen at £100 a unit is £1,000. That sits neatly inside the standard band once the worktop and appliances are added.
It suits a complicated job far less well. If your waste has to move, your walls are out of true or your floor slopes, the unit count stops describing the work. That is when fitters switch to day rates.
Here is the useful part. Which model you are quoted tells you how the fitter has read your kitchen. A per-unit price means they think it is simple. A day rate with no fixed end date means they think it is not, and they may well be right.
The 6 Jobs Inside a Kitchen Fit
A single fitting price is really six jobs bundled together. Seeing them separately is the fastest way to work out why one quote is higher than another.
- Strip-out and disposal: £200 to £250, usually half a day to a day.
- First-fix plumbing: £250 to £300, half a day to a day.
- First-fix electrics: £250 to £350, half a day to a day.
- Unit installation: £200 to £280, and this is the long one at two to four days.
- Worktop templating and fitting: £250 to £300, though worktop installation on its own can run £300 to £1,000, depending on the material.
- Second fix and finishing: appliances and taps, plus about £100 to £200 to fit a built-in oven.
Add tiling on top if you need it. A splashback runs about £40 to £60 per square metre.
Two quotes that look £900 apart often differ on exactly two of these lines. Usually it is strip-out, where one firm assumed you were doing it, and worktops, where one firm assumed you were buying them templated.
What Electricians, Plumbers and Tilers Add
Your fitter is rarely the whole labour bill. Most kitchen fits pull in two or three other trades, and each one carries its own day rate.
- Electrician: £250 to £400 a day.
- Plumber: £180 to £300 a day.
- Gas engineer: £150 to £250 for the gas work.
- Plasterer: £180 to £250 a day.
- Tiler: £200 to £300 a day.
On a mid-sized kitchen you might use the electrician for one to three days and the plumber for one to two. That is why a job with a "cheap" fitter can still land near the top of the band.
Some fitters price and manage these trades for you. Some expect you to book them. Neither is wrong, but the second one produces a lower headline quote for more work on your part, and that is worth knowing before you pick. Ask directly: are these trades in your price, or mine to arrange?
How Long a Kitchen Fit Takes and Why That Sets the Price
The fitting stage itself is commonly 5 to 10 days. Because most fitters charge by the day, that spread is the price. Everything that adds a day adds a day rate.
Picture a five-day fit at £300 a day. Stretch the same kitchen to nine days and you have paid for four more days of labour, without buying a single extra unit. Nothing about the kitchen has altered. Only the number of mornings someone turned up.
That is also why the cheapest day rate can end up the dearest job. A fitter who is quick and organised may charge more per day and still hand you a smaller bill, because they are on site for less time. Speed is part of the price, even though no quote ever lists it.
This is why the length of the job deserves as much attention as the rate. Ask any fitter for a day count, not just a price, and ask what would make it longer. The honest answers are usually the same few things: services moving, an old floor, or a worktop that has to go away to be made.
Stone worktops build a gap into the middle of the job. The kitchen gets templated, the worktop is made off site, then someone comes back to fit it. You may be without a usable kitchen for several days in between, which costs you nothing on the quote and quite a lot in takeaways.
Two more scheduling points are worth knowing. A fitter who books your electrician and plumber for the right days keeps the job tight. One who does not can leave you paying for a fitter to wait.
What Pushes a Kitchen Fitting Quote Above £3,000
Three things reliably take a fit out of the standard band, and none of them are about the units.
Moving services. Leaving the sink and hob where they are keeps the plumbing and electrics to a first-fix tidy-up. Moving them means new runs, more trade days, and often plastering afterwards. It is the single most expensive decision you can make without buying anything.
Flooring. Replacing the floor means the old one comes up and the new one goes down. The units then have to be worked around or fitted on top. It adds days, and days are what you are paying for.
Stone worktops. Laminate can often be cut on site the same day. Quartz and granite have to be templated, made off site, then delivered and fitted on a second visit. That is why worktop fitting alone can reach £300 to £1,000.
Older houses add their own cost. Walls that are not square and floors that are not level turn a two-day unit install into a four-day one. Nobody can price that accurately from a photo, which is why a site visit is worth more than three phone quotes.
How to Read a Quote: VAT, Skips and Contingency
The cheapest quote is often cheapest because something is missing. Three lines go astray more than any others.
VAT. Once turnover passes £90,000, a fitter must be VAT registered and will charge it. One below that threshold does not. Two quotes can be £500 apart purely on tax, which is not a discount, just a different sized business. Ask whether the figure you have been given includes VAT.
Waste. An old kitchen fills a skip. Skip hire for kitchen waste costs £150 to £350 in most UK areas. If your quote has no disposal line, that cost has not gone away, it has just moved to you.
Contingency. A sensible allowance is 10% to 15% of your total budget. Kitchens hide their problems behind units for twenty years, and rotten floorboards or old wiring only appear on strip-out day.
One more figure helps you sanity-check the whole thing. Labour usually lands at 30% to 40% of a full kitchen budget, with materials taking 60% to 70%. If a quote has labour at two-thirds of your spend, either the units are very cheap or the fitting is priced high.
FAQ
How Much Does a Fitter Charge to Fit a Kitchen?
Labour-only fitting for a standard UK kitchen costs about £1,700 to £3,000. Once other trades and a strip-out are included, a small-to-large kitchen commonly runs £2,200 to £4,600. The figure depends far more on whether services move than on how many units you have.
What Is a Kitchen Fitter Day Rate in 2026?
Most UK kitchen fitters charge £250 to £350 a day in 2026, and some guides put the average nearer £200 to £300. In London and the South East, experienced fitters charge £350 to £500 a day. By the hour, fitting averages roughly £37.
How Much Does It Cost to Fit 6 Base Units?
At a typical per-unit price of £70 to £120, six base units work out at roughly £420 to £720 in fitting labour. That covers hanging and levelling the units only. Worktops, appliances, plumbing and electrics are priced on top of it.
Is Labour or Materials the Bigger Cost?
Materials, usually. On a full kitchen, materials take about 60% to 70% of the budget and labour takes 30% to 40%. That flips only on very cheap units or a job with heavy structural work, where the trade days start to outweigh what you bought.
Does a Kitchen Fitter Do the Electrics and Gas?
Some do, many do not. Gas work must be done by a suitably registered engineer, and electrical work has to meet current rules. Expect a gas engineer at £150 to £250 and an electrician at £250 to £400 a day, either inside your fitter's price or arranged by you.
Verdict on Kitchen Fitting Labour Costs
Your labour-only anchor for a standard kitchen is £1,700 to £3,000. Once the strip-out and the other trades are folded in, expect £2,200 to £4,600. If you are in London or the South East, price the day rate at £350 to £500 rather than the national £250 to £350, because that is where most of the difference between quotes comes from.
Then stop comparing totals. Ask each fitter for the six lines, from strip-out through to second fix. Ask how many days they expect to be on site. Ask whether VAT and waste are in the price. Two quotes that looked £900 apart usually turn out to be two different jobs, and once they are itemised, the real kitchen fitting cost is easy to see.
Kitchen Fitters Croydon is not affiliated with, endorsed by, or an approved installer for Wickes, Howdens, Wren, B&Q, IKEA, Magnet or any other kitchen retailer. Retailer names are used only to describe the kinds of kitchen that local fitters install.
Want a Croydon-specific figure? Get quotes from local fitters.
More Cost & Timing Guides
Get Kitchen Fitting Quotes in Croydon
Tell us what you need and we will pass it to fitters covering your postcode.